First Phase Development

The site formation and infrastructure works under HSK/HT NDA First Phase development (i.e. Advance Works Phases 1 & 2 and Stage 1 Works) commenced in 2020 in phases.

Mainly covers:

  1. site clearance and formation (including land decontamination works) for about 14 hectares ("ha") of land, together with the provision of associated engineering infrastructure, to ready these formed land for subsequent development of purpose-built multi-storey buildings/open-air sites for brownfield operations and village resite areas for affected building lots under the Village Removal Terms, and for construction of the proposed infrastructure works in paragraph(b) below;
  2. engineering infrastructure works including a district distributor road, local roads, sewerage (including a pumping station), drainage pipes (including a detention pond) and water mains; and
  3. environmental mitigation measures and the environmental monitoring and audit ("EM&A") programme.

Consultant:

AECOM Asia Company Limited
-
Agreement Title: Hung Shui Kiu New Development Area Advance Works, Phases 1 & 2 - Design and Construction
-
Agreement No.: CE 39/2016 (CE)

Mott MacDonald Hong Kong Limited
-
Agreement Title: Hung Shui Kiu New Development Area Stage 1 Works - Design and Construction
-
Agreement No.:CE 56/2016 (CE)

First Phase Development - YL/2019/02

Contract No. YL/2019/02

Hung Shui Kiu / Ha Tsuen new development area advance works phase 2 – site formation and engineering infrastructure

Scope:
  1. site clearance and formation (including land decontamination works) for about 2.6 hectares of land, together with the provision of associated engineering infrastructure;
  2. construction of local roads including a one-lane two-way carriageway of about 330 metres (m) long with passing bays connecting Tsing Yick Road to Ng Lau Road;
  3. construction of about 340 m long sewer;
  4. construction of about 1 500 m long water mains; and
  5. implementation of environmental mitigation measures for the works mentioned above.
Commencement Date:
August 2020
Completion Date:
2024 (Anticipated)
Contract Sum:
$112 million

Contractor:
Adrian Construction Limited
Project information:
https://www.cedd.gov.hk/eng/our-projects/major- projects/index-id-91.html

First Phase Development - YL/2020/03

Contract No.:YL/2020/03

Hung Shui Kiu/Ha Tsuen New Development Area Stage 1 Works – Site Formation and Engineering Infrastructure

Scope:
  1. site clearance and formation (including land decontamination works) for about 14 hectares of land, together with the provision of associated engineering infrastructure;
  2. construction of a district distributor road of about 500 metres long, which will be a dual two- to three-lane carriageway connecting to the existing interchange underneath the Kong Sham Western Highway, construction of a single two-lane local road of about 350m long, widening of a section of Fung Kong Tsuen Road to single two-lane carriageway of about 150m long and associated junction/road improvements;
  3. construction of about 1 700m-long sewers, about 360m-long sewage rising mains and a sewage pumping station (including electrical and mechanical works);
  4. construction of about 1 700m-long drainage pipes and the associated detention pond;
  5. construction of about 2 300m-long water mains; and
  6. implementation of environmental mitigation measures, environmental monitoring and an audit programme for the works mentioned above.
Commencement Date:
April 2021
Completion Date:
2025 (anticipated)
Contract Sum:
$445 million

Contractor:
China Geo-Engineering Corporation
Project information:
https://www.cedd.gov.hk/eng/our-projects/major- projects/index-id-91.html

Second Phase Development

The detailed design of site formation and infrastructure works under Hung Shui Kiu/Ha Tsuen New Development Area (HSK/HT NDA) Second Phase development commenced in 2020 in phases.

Advance Works Phase 3 mainly covers:

  1. site clearance and formation (including land decontamination works) of about 51 ha of land together with the provision of associated engineering infrastructure, to ready these formed land for subsequent development of public and private housing, community facilities, commercial and industrial premises and other uses, and for construction of the proposed infrastructure works in paragraph(b) below;
  2. engineering infrastructure works including a primary distributor road, district distributor roads, local roads, sewerage (including pumping stations), drainage, water supply, landscaping, electrical and mechanical ("E&M") and associated works; and
  3. environmental mitigation measures and the EM&A programme for the works above.

Stage 2 Works and related studies mainly cover:

  1. site clearance and formation (including land decontamination works) of about 200 ha of land, together with the provision of associated engineering infrastructure, to ready these formed land for subsequent development of public and private housing, community facilities, commercial and industrial premises, the Green Transit Corridor (comprising the Environmentally Friendly Transport Services, footpaths and cycle tracks) and other uses, and for construction of the proposed infrastructure works in paragraph(b) below;
  2. engineering infrastructure works including district distributor roads, local roads, revitalisation of existing channels, sewerage (including pumping stations), drainage (including pumping stations), water supply, landscaping, E&M and associated works;
  3. environmental mitigation measures and the EM&A programme for the works above; and
  4. related studies covering the following areas:
    (i)
    reviewing the overall public and private housing mix with a view to increasing the share of public housing in view of the latest policy direction;
    (ii)
    reviewing infrastructure provisions to support the revised housing mix and examining the possibility of reprovisioning Tin Ying Road around its current location;
    (iii)
    assessing the feasibility of green and smart initiatives including common utility tunnels for the entire New Development Area development; and
    (iv)
    conducting an urban and green design study for the area around the riverside promenade along the revitalised Tin Shui Wai River Channel in the north-eastern extent of Hung Shui Kiu/Ha Tsuen (HSK/HT) New Development Area (NDA).

Consultant:

Ove Arup & Partners Hong Kong Limited
-
Agreement Title: Hung Shui Kiu/Ha Tsuen New Development Area Package A Works for Second Phase Development - Design and Construction
-
Agreement No. CE 1/2020 (CE)

Ove Arup & Partners Hong Kong Limited
-
Agreement Title: Hung Shui Kiu/Ha Tsuen New Development Area Package B Works for Second Phase Development - Design and Construction
-
Agreement No. CE 71/2020 (CE)

Second Phase Development - YL/2021/02

Contract No.:YL/2021/02

Ground Investigation Works for Hung Shui Kiu/Ha Tsuen New Development Area Package A Works for Second Phase Development

Scope:
Ground investigation works including drillholes, trial pits, in-situ testing, laboratory testing, contamination assessment and geophysical survey.
Contract Date:
June 2022
Completion Date:
December 2023
Contract Sum:
$106 million

Contractor:
Fugro Geotechnical Services Limited

Second Phase Development - YL/2021/05

Contract No.:YL/2021/05

Ground Investigation Works for Hung Shui Kiu/Ha Tsuen New Development Area Package B Works for Second Phase Development

Scope:
Ground investigation works including drillholes, trial pits, in-situ testing, laboratory testing, contamination assessment, geophysics survey and comprehensive utilities survey.
Contract Date:
October 2022
Completion Date:
Feb 2024 (anticipated)
Contract Sum:
$58 million

Contractor:
Intrafor Hong Kong Limited

West Development Office, Civil Engineering and Development Department 9/F, Sha Tin Government Offices, 1 Sheung Wo Che Road, Sha Tin, New Territories
Tel: (852) 2158 5680 | Fax: (852) 2693 2918 | Email: info@hskhtnda.hk

Development Bureau - The Government of the Hong Kong Special Administrative Region of the People's Republic of China | Civil Engineering and Development Department - The Government of Hong Kong Special Administrative Region

Important Notices | Privacy Policy Statement | Privacy Policy Statement